2026-11-16 06:04:23
A replacement ONT only needs re-provisioning if your network identifies the device rather than the subscriber. Here is how serial allow-lists, LOID schemes and swap procedures work in hotels and apartment blocks.
2026-11-13 06:04:20
IPv6 on a PON is less about configuration and more about who advertises the prefix. A five-tier address plan from /32 to /64 per room, four RA and DHCPv6 combinations, the ONU's real boundary, six dual-stack traps, and a staged rollout.
2026-11-11 06:04:41
Most PON outages are lost configurations, not dead hardware. What an OLT backup must actually cover, where each backup method fails, four change-window rules and a three-tier rollback rule.
2026-11-09 06:05:42
PON upstream is time-division multiplexed. One ONU that keeps its laser on occupies everyone else's timeslots and takes the whole port down at random — while the power readings look fine. Here is the five-step way to find it, and what to do once you have.
2026-11-06 06:04:35
Fibre doesn't carry lightning, but the ONU still needs mains power, and mains power does. Where storms are frequent and the grid is weak, most PON outages come down to earthing, surge protection and battery runtime rather than the optical layer.
2026-11-04 06:07:18
Most PON downtime isn't caused by the fault — it's caused by waiting for a replacement. This covers sizing the spare pool, filtering out failures that don't need a swap, splitting stock across three tiers, recovering dead units and choosing the right RMA channel.
2026-11-02 06:04:16
Moving an OLT uplink to 10G rarely fails on hardware; it fails in the ninety minutes of the cutover. This run sheet covers the five baseline numbers, module swap versus parallel link, optical margin, LAG hashing, rollback triggers and the 72-hour watch list.
2026-10-30 14:54:23
A hotel PON rarely fails on hardware — it fails on sequence. Here is the dependency map for six subsystems, four phases with a hard exit gate on each, room-level checklists, cross-service stress tests and the handover pack.
2026-10-28 06:03:31
Four builds on one PON means random faults, no reproduction and no confident rollback. A field-proven method: a stable / pilot / hotfix baseline, 20-50-100% rollout waves, a 2% failure stop threshold, and a version register that keeps three thousand ONUs traceable.
2026-10-26 06:05:25
How to bill each apartment on a shared PON: three authentication paths (PPPoE, DHCP Option 82, IPoE portal), circuit-id design, RADIUS speed profiles, trial and suspension procedures, and nine go-live checks.
2026-10-23 06:04:40
A 100 Mbps plan that tests at 40 is usually a stacking problem rather than a fault: shared GPON upstream, the bandwidth a DBA actually assures per T-CONT, and an undersized burst bucket in the rate-limit profile. The arithmetic, three workable profiles and a five-step field check.
2026-10-21 06:03:26
Retrofits fail in the riser, not in the equipment. A practical guide to sizing shaft capacity, choosing centralised or distributed splitters, budgeting site-specific optical loss, and cutting over floor by floor without closing the building.